customized high-quality plastic injection molds for vacuum cleaner with affordabale price molds
Automotive car parts plastic injection mould/mould manufacturer with high technology mold If you'd like to talk to us about anything, please click "contact us"!
Mould Name |
Automotive car parts plastic injection mould/mould manufacturer with high technology mold |
Mould Material |
P20,2738,718H,NAK80,2316,S136,H13,etc |
Runner |
Hot runner |
Hot Runner Brand |
Chinabrand:HASCO:YUDO and so on |
Design Software |
UG: Aoto CAD and so on |
T1 Time |
30-35 days |
Plastic Material |
PP, PC, ABS, PET, ABS+GF, ABS+PC, etc. |
Warranty Period |
1 year or 1 million shot times(in this period, if the mold have problem, we will offer the parts or service for free, but not include the problems caused by the wrong operation) |
Mould Precision |
+/-0.01mm |
Gate Type |
Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc. |
Mold Cooling System |
Water cooling or Beryllium bronze cooling, etc. |
Mold Hot Treatment |
Quencher, nitridation, tempering, etc. |
Lead Time |
25 weeks |
Company Profile
Factory Tour
Our Customers
Order Process
Our Advantages
1. Professional design
2. Strict quality control
3. Rational cost management for customer
4. On-time delivery
5. 24-hour online customer service
6. Customized on demand, accept small order quantity
7. One year after-sales service
FAQ
1. Are you a manufacturer or a trading company?
We're a manufacturer. We are committed to providing our customers with R&D, innovative, high-quality products, and customized solutions for their diverse needs.
2. What kind of service do you offer?
We provide customers with a one-stop solution for product design, mold development, and injection molding processing.
3. Where is your factory located? How can I visit there?
Our factory is located in the Huangyan, Zhejiang Province, China. It is 30 minutes' drive from Luqiao Airport and 10 minutes' drive from Taizhou Railway Station. We can pick you up if you need to. You are welcome to visit our factory.
4. How long does it take to make the mold?
The production time depends on your specific requirements, normally the lead time is 45 days.
5. How long is the warranty on the mold?
1 year (during this period, if there is any problem with the mold, we will provide parts or service free of charge, but does not include problems caused by your incorrect operation)