Customization: | Available |
---|---|
Warranty: | 1 Year |
Shaping Mode: | Injection Mould |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mold Name | plastic chair/stool injection mould |
Mold Material | P20,2738,718H,NAK80,2316,S136,H13,etc |
Runner | Cold / Hot |
Hot Runner Brand | Chinabrand:HASCO:YUDO and so on |
Design Software | UG: Aoto CAD and so on |
T1 Time | 30-35 days |
Plastic Material | PP, PC, ABS, PET, ABS+GF, ABS+PC, etc. |
Warranty Period | 1 year or 1 million shot times(in this period, if the mold have problem, we will offer the parts or service for free, but not include the problems caused by the wrong operation) |
Mold Precision | +/-0.01mm |
Gate Type | Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc. |
Mold Cooling System | Water cooling or Beryllium bronze cooling, etc. |
Mold Hot Treatment | Quencher, nitridation, tempering, etc. |
Lead Time | 25 weeks |
1. Product Designs
Advanced 3D modeling technology and rapid prototyping equipment create highly accurate prototypes that help you evaluate designs more intuitively. Create innovative design solutions based on your needs and market trends. Optimize designs through multiple iterations and testing to ensure product functionality, manufacturability, and market competitiveness.
2. Custom Molds
High-precision CNC machining centers and EDM equipment to ensure mold processing accuracy. The technical team has rich experience in mold design and manufacturing, able to cope with a variety of complex structures and precision requirements. Each pair of molds is strictly tested to ensure that it meets the high standard requirements of customers.
3. Injection Molding
A wide range of plastic material options are available, including ABS, PP, PC, PE, etc., according to product functions and needs. Automated injection molding lines ensure production efficiency and product consistency. From raw material inspection to finished product testing, the whole process is strictly controlled to ensure that product quality meets international standards.
-Advanced Equipment
Adopting imported five-axis machining center, EDM machining center, injection molding machine, and three-coordinate testing center.
-Capacity Assessment
Capacity assessment and planning according to different categories of mold to ensure on-time sample and delivery.
-Precision Assembly
A highly demanding mold assembly process ensures mold details and quality for smoother mold operation and higher production efficiency.
-Professional Team
With an independent industrial design team, we ensure the success of mold opening through pre-DFM(Design For Manufacturability) analysis and interactive discussions.
-Efficient Communication
Maintain close contact with customers and provide timely feedback on project progress to ensure projects are completed.
-Continual improvement
Through continuous learning and innovation, we improve our technology and service quality to meet the changing needs of our customers.
-One-Stop Service
Provide integrated solutions from product design, and mold manufacturing to injection molding production, saving time and cost.
-Standard lold Bases
We are adopting a standard mold frame design. it is convenient for maintenance and replacement, shortens post-maintenance time,and can complete 500 pairs.
-Competitive Prices & After-Sales Service
Provide competitive prices and quality after-sales service, and respond to customer needs at any time to ensure customer satisfaction.
1. Are you a manufacturer or a trading company?
We're a manufacturer. We are committed to providing our customers with R&D, innovative, high-quality products, and customized solutions for their diverse needs.
2. What kind of service do you offer?
We provide customers with a one-stop solution for product design, mold development, and injection molding processing.
3. Where is your factory located? How can I visit there?
Our factory is located in the Huangyan, Zhejiang Province, China. It is a 30-minute' drive from Luqiao Airport and a 10-minute drive from Taizhou Railway Station. We can pick you up if you need to. You are welcome to visit our factory.
4. How long does it take to make the mold?
The production time depends on your specific requirements, normally the lead time is 45 days.
5. How long is the warranty on the mold?
1 year (during this period, if there is any problem with the mold, we will provide parts or service free of charge, but this does not include issues caused by your incorrect operation)